Building Model Production Process

Mar 01, 2020

Pre-production planning

According to the plan, elevation, effect, and model requirements provided by Party A, the model production style is formulated.

Model quote budget

The budgeter determines the model charge according to the model scale size, material technology and drawing depth, and signs a production service order.

Production organization review

The technical staff will check the analysis drawings to determine the model material, processing technology, production period and effect requirements.

(1) Construction process:

Architectural engineer according to the drawings provided by Party A, the effect is based on the principle of authenticity and beauty. All buildings adopt AutoCAD drawing, computer engraving machine cutting details, and manual assembly method by construction technicians, which not only guarantees the quality of each component but also the construction period.

(2) Environmental landscape design and production process:

The overall environment will be controlled by a professional landscape architect. Professional production personnel combined with drawings for design and production. The principle is to reproduce the designer's design intent according to Party A's design drawings. Don't manipulate it freely. At the same time embellishment with artificial trees, sketches, sculptures, etc., makes the entire landscape part beautiful and delicate.

(3) Building environment lighting assembly:

The lighting system is designed and manufactured according to Party A's requirements, reflecting the night scene effect of the sand table.